in the rack.
-When mounting this unit in a partially filled rack, load the rack from the bot-
tom to the top with the heaviest component at the bottom of the rack.
-If the equipment rack is on wheels, ensure that the brakes are engaged
and that the rack is stabilized.
Note:
Accessories: The screws needed to properly mount the device to the rack
are not shipped with the equipment, nor the system ground kit. The device
already mounts the L-brackets and is provided with a power cord C13
(European).
Note:
Airflow consideration: There are no standards for airflow in rack system
but the device should be configured accordingly to the emplacement of hot
and cold aisles. The default airflow of the device is from front-panel (cold) to
back-panel (hot).
To properly mount the device to a rack cabinet:
1.
Place the device on the floor or on a sturdy table near the rack.
2.
Use a tape measure to verify the interior dimensions of the rack.
3.
Carefully lift the device and position the rear of the device between the equipment
rack mounting posts and slide the device into the rack until the L brackets on the
sides of the device are flush with the equipment rack front posts.
4.
Align the mounting holes in the L bracket with the mounting holes in the equipment
rack posts.
5.
Secure the device using four 3/4-inch screws through the elongated holes in the L
bracket and into the threaded holes in the mounting post (or the clip-nuts or cage-
nuts).
2.6 Rack Installation
CHAPTER 2 • WR-Z16 User Manual Rev. v3.4
17