EasyManuals Logo

Palm Tungsten Tungsten E User Manual

Palm Tungsten Tungsten E
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #131 background imageLoading...
Page #131 background image
Checking off a task
121
Checking off a task
You can check off a task to indicate that you’ve completed it. You can set options
to record the date that you complete the task, and you can show or hide completed
items. See “Setting Tasks Preferences” later in this chapter.
To check off a task:
Tap the check box on the left side of the item.
Changing task details
The Tasks Details dialog box enables you to change settings for individual items.
To display the Tasks Details dialog box:
1. Tap the text of the item whose details you want to change.
TIP
You can also select an item with the navigator. See Using the navigator”
in Chapter 2 for details.
2. Tap Details.
3. Change any of the settings.
NOTE
To add a task to a category, see “Categorizing applications” in Chapter 4.
Completed
task

Table of Contents

Other manuals for Palm Tungsten Tungsten E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Palm Tungsten Tungsten E and is the answer not in the manual?

Palm Tungsten Tungsten E Specifications

General IconGeneral
BrandPalm
ModelTungsten Tungsten E
CategoryPDA
LanguageEnglish

Related product manuals