11
Introduction
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
28. Remove advancing bolts and retract
formwork.
29. Mount scaffold mounting rings.
30. Remove the following anchor from
the previous casting step.
31. Move climbing unit to next wall
section. Continue with standard
cycle.
32. Dismantle the climbing unit.
18. Attach finishing platform.
19. Move climbing unit to second wall
section.
20. Bolt on finishing platform and attach
guardrails.
21. If necessary, mount ladder.
Standard Cycle
22. Mount wind bracing if required.
23. Clean formwork and adjust.
24. Install reinforcement to wall.
25. Mount leading anchor and close
formwork.
26. Place formwork anchor.
2 7. Pour wall section.
AuV CB 240 EX.indb 11 29.06.16 09:44