CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
C1 Planning and Work Preparation
V
1
Connecting VARIO GT 24
formwork
Mounting the Leading Anchor
During formwork design, attention must
be paid that there is sufficient spacing
between the bracket axis and the GT 24
Formwork Girders.
Otherwise mounting the Leading Anchor
(5) with the Anchor Positioning Stud
M24 (5.9) is not possible.
(Fig. C1.05)
Height Adjusting Units
Depending on the weight of the form-
work, the number of height adjusting
units (4.3) is to be determined for each
Strongback.
(Fig. C1.06)
perm. V
1
= 12.8 kN
Fix all walers (10.4) in the area of the
Strongback (4) with waler fixations (4.4).
Strongback CB 270 (4.1)
The top height adjusting unit is only
mountable with standard waler spacings
of 1.78 m or 2.07 m.
(Fig. C1.07.1)
Strongback CB 380 (4.2)
The top height adjusting units are only
mountable on walers in standard spacings
from 1.78 m to 3.26 m from the lowest-
positioned waler.
(Fig. C1.07.2)
Fig. C1.05
Fig. C1.07.1 Fig. C1.07.2
1,776 m
2,072 m
1,776 m
3,256 m
4.1
4.3
4.4
5
5.9
3 cm>
Fig. C1.06
4
4.4
4.4
4.2
4.4
4.4
4.4
4.4
4.3
4.3
AuV CB 240 EX.indb 62 29.06.16 09:46