EasyManua.ls Logo

Peri CB 240 - Assembly of CB 240 Carriage

Peri CB 240
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
A1 Assembly of the CB 240 Platforms
2.2
2.4
2.4
2.4
2.3, 2.4
2.3, 2.4 2.3, 2.4
Assembly of CB 240
Carriage
Assembly
1. Retract the wedge (2.2).
2. Insert rack (2.7) into the carriage (2.1).
(Fig. A1.16)
3. Secure with wedge (2.2). (Fig. A1.17)
4. Remove lower-positioned bolts (2.4)
and roller (2.3) from the carriage.
(Fig.A1.16)
Fig. A1.16
Fig. A1.17
Fig. A1.18
5. Depending on the height of the gir-
ders (24 cm or 16 cm), mark out both
bolts (2.4) and roller (2.3) accordingly.
(Fig. A1.18)
24
16
(2.1) Carriage CB 240
(2.2) Wedge
(2.3) Rollers Ø 60 x 85
(2.4) Bolt Ø 25 x 180 with Cotter Pin 4/1
(2.5) Traction Screw SW 19
2.7
2.8
2.9
2.1
2.6
2.3
2.4
2.22.5
2.42.3, 2.4
(2.6) Bolt Ø 16 x 65/86 with Cotter Pin 4/1
(2.7) Rack
(2.8) Strongback Connection Ø 26
(2.9) Adjustable Brace Connection Ø 26
Girder h = 24 cm Girder h = 16 cm
2.3
2.4
AuV CB 240 EX.indb 16 29.06.16 09:44

Related product manuals