CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
A1 Assembly of the CB 240 Platforms
13.1
Assembly of Guardrails
End Guardrail Posts
For longer cantilevers, it is necessary to
additionally support the guardrail boards
with one or more End Guardrail Posts.
1. Mark the outside edge of the End
Guardrail Post (12.3) on the guardrail
boards (12.1 + 12.2).
2. Align End Guardrail Post and fix to
girder (13.1) with screw clamp.
(Fig. A1.31 + A1.32)
3. Use wood screws (6x) 6 x 80 DIN 571
(12.8) for fixing to girder. (Fig. A1.33a)
4. Mount the pre-drilled guardrail boards
using round head bolts M8 x 100
DIN 603 (12.5).
Guardrail Post Extension CB (12.9)
(Fig. A1.33b + A1.34b)
As an alternative to the guardrail
boards, scaffold tubes can be con-
nected with Guardrail Connector CB
(12.6) and round head bolts M8 x 100
DIN 603 (12.5).
Round head bolts M8 x 125 (12.7) are
to be used for the guardrail boards.
Assembly using Two GT 24 Girders
1. Turn End Guardrail Post. The post rests
against the planking.
2. Using wood screws (6x) 6 x 80
DIN 571 (12.8), fix to pre-drilled outer
girder. (Fig. A1.34a)
Fig. A1.31
Fig. A1.32
Fig. A1.33a Fig. A1.33b
Fig. A1.34b
Fig. A1.34a
Assembly using one GT 24 Girder
Assembly using two GT 24 Girders
12.3
12.5
12.5
12.5
12.8
12.8
12.3
12.5
12.5 / 12.7
12.5 / 12.7
12.6
12.6
12.5
12.5
12.8
12.1 12.3
12.2
12.8
1,00 m
1,00 m
12.9
12.9
AuV CB 240 EX.indb 21 29.06.16 09:44