EasyManua.ls Logo

Peri CB 240 - Page 33

Peri CB 240
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
B1 Work on the Construction Site
Anchoring
Check if the cone fits correctly and is
clean.
Assembly of Scaffold Mounting Ring
M24
1. Turn over wire nails with a hammer.
2. Remove the Anchor Positioning Stud
M24 (5.11) from the cone with an Al-
len Key SW 14. (Fig. B1.16)
3. Place the Scaffold Mounting Ring M24
(5.6) on the cone cup of the Screw-On
or Climbing Cone (5.1/5.3) and secure
using bolt M24 x 120 ISO 4014-10.9
(5.7). (Fig. B1.17)
4. Firmly tighten bolt by hand using socket
wrench SW 36. (Fig. B1.18)
Fig. B1.16
Fig. B1.17
Fig. B1.18
5.11
5.6
5.1
5.7
5.3
AuV CB 240 EX.indb 31 29.06.16 09:44

Related product manuals