EasyManua.ls Logo

Peri CB 240 - Page 5

Peri CB 240
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
L
1
L
2
5.2 5.1 5.75.6
5.4 5.5 5.65.3 5.7
5.8
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
Introduction
Anchoring to the building structure
Version 1
5.4 Threaded Anchor Plate DW 15*
5.5 Tie Rod DW 15*, Z-12.4-70
L
1
= h – 8 cm or Tie Rod B15*, Z-12.5-82
5.3 Climbing Cone 2 M24/DW 15
5.6 Scaffold Mounting Ring M24, galv.
5.7 Hex. Bolt M24 x 120 ISO 4014-10.9
5.8 Spacer Tube DR 22* (optional)
L
2
= h – 18.5 cm (tolerance 0 to +5 mm)
Anchoring depth h ≥ 18.5 cm (variable).
* “Not re-usable
When using the PVC Spacer Tube, the
tie rod (5.5) can be re-used.
Version 2
5.2 Threaded Anchor Plate DW 20*
5.1 Screw-On Cone 2 M24/DW 20
5.6 Scaffold Mounting Ring M24, galv.
5.7 Hex. Bolt M24 x 120 ISO 4014-10.9
Anchoring depth h = 15.5 cm (fix).
* “Not re-usable
Overview, Main Components
15,5 cm
Ø 10 cm
h
Ø 8 cm
AuV CB 240 EX.indb 3 29.06.16 09:44

Related product manuals