EasyManua.ls Logo

Peri CB 240 - Page 67

Peri CB 240
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
65
270
45 cm
40,5 cm
30
60
90
120
270
45 cm
40,5 cm
30
60
90
120
270
45 cm
40,5 cm
240
50 cm
34,3 cm
30
60
90
120
240
50 cm
34,3 cm
30
60
90
120
120
240
50 cm
34,3 cm
240
270
120
2,10 m
2,10 m
3,30 m
2,10 m
3,30 m
2,025 m
2,025 m
3,226 m
2,025 m
3,931 m
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
C1 Planning and Work Preparation
Element TR 270 x 240 in a vertical
position
The Connector TRIO-CB is to be bolted
to the horizontal struts.
(Fig. C1.12.1 – C1.12.3)
The illustrations show girders with a
height of 24 cm.
Connecting TRIO formwork
Element TR 270 x 240 in a horizontal
position. The Connector TRIO-CB is to be
bolted to the vertical struts.
(Fig. C1.13.1 – C1. 13.3)
Fig. C1.12.1 Fig. C1.12.2 Fig. C1.12.3
Fig. C1.13.1 Fig. C1.13.2 Fig. C1.13.3
AuV CB 240 EX.indb 65 29.06.16 09:46

Related product manuals