EasyManua.ls Logo

Pfaff 1474 E1

Pfaff 1474 E1
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting and commissioning the machine
8 - 5
8.02 Commissioning the machine
Before commissioning the machine, check the electrical leads for any damage.
Clean the machine thoroughly and oil it / fill with oil ( see chapter 12 Care and
maintenance ).
Have specialists ensure that the machine’s motor can be operated with the available
electricity supply and that it is connected correctly to the terminal box. If not, the
machine must not be operated.
8.03 Turning the machine on/off
Turn the machine on ( see chapter 7.01 On/Off switch ).

Table of Contents

Related product manuals