Description Value range
seconds 0001 ... 9999
No. of delayer D: 01 ... 15
12.4.2.1.2
‘Init’
Initial conditions
Using the triggering event
‘Init’
initial conditions can be set at the begin‐
ning of a program sequence.
triggering event (trigger) Action
Init - Relay 2 closed
Init - Contact -
The example means:
As soon as the programme is started (via
‘Timer
è
Activation
è
active’
or mains voltage on),
‘Init’
sets
‘Relay 2’
to
‘closed’
and the
‘Operating
mode’
to
‘Contact’
.
Example
12.4.2.1.3 Selecting time events and switching point
The cyclic time events periodically trigger actions. That is why a program
line consists of a cycle and a switching point.
The cycle specifies after which time the action is to be repeated.
The switching time specifies when the action is to take place.
Time events (triggers) Action
Cycle Switching time
workdays 1 (Mo-Fr) Time of day 12:00 Manual
Example
Tab. 16: Cyclic time events
Cycle Time
‘hourly’
hourly at mm Minute
‘daily’
daily at the time mm.ss, Monday to Sunday
‘workdays 1 (Mo-Fr)’
daily at the time mm.ss, Monday to Friday
‘workdays 2 (Mo-Sa)’
daily at the time mm.ss, Monday to Saturday
‘Weekend (Sa+Su)’
daily at the time mm.ss, Saturday and Sunday
‘weekly’
weekly at the time mm.ss on day xxxxxx.
‘monthly’
monthly at the time mm.ss on the day dd. Day* of the
month
* Value range is restricted to 01 to 28 days.
Set up /
‘Menu’
64