Requirements
You have to enter the Begin date and the End date of the report. The default End date
is then 31 days later.
You can specify another End date, but maximum is Begin date
+ 31 days.
Default period:
• Begin = 1st day of the current month
• End = Current day
Output
• Screen
• USB printer
• USB memory key
Content
Funds Summary Report
This report displays the information on funds usage since the installation of the system.
The content is limited to the history available in the PSD.
• Die Number.
• Current Date and Time on printed report only.
Requirements
This report is available as user.
156
| Page 156 | Apr-28-2023 03:14 |
8
Reports