EasyManua.ls Logo

Quantum 800 - Page 23

Quantum 800
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© İnnosis Makine 23
Fig.9 Possible seat movement in reverse movement of the crawler
Every movement of the Pile Driver, although it is aected inside the operave zone or
construcon site, must always be carried out with the ed Flashing Light on. This light is placed
on the rear of the machine and will auto start when the machine is running see gure 10.
Fig 10 Trac Indicator
The preparaon for driving of the piles is very easy: the body of the pile is posioned in
an appropriate support, named pile guide bearing, which is part of the pile hammer. It
makes the vercal movement easier. The headstock needs to be inserted in the pile
hammer template. The role of headstock is driving the pile in a precise and fast way, in
addion to protect it from geng loosened from the pile hammer during the piling
phase. When the headstock is inserted in right place, it will be possible to acvate the
hammer and start driving the pile.

Table of Contents