EasyManuals Logo

Rational CombiMaster Plus CMP User Manual

Rational CombiMaster Plus CMP
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
- 61 - V08 en, SCC
CleanJet+Care: Error messages - Abort program SCC
Possible error messages during CleanJet +Care (ref: error trees in Trouble shooting manual)
The error is only shown at the end of the program.
Display Problem
For repair refer to error tree.
Reset error memory:
from SW 7-00-08
aer repair cancel error
by:
Reset error memory:
SW before 07-00-08
aer repair cancel error by:
Service 10 SC pump and hose Function test
Cleanjet
refer to fault tree
No water Y1, water tap open water tap, clean
strainer
Service 41 Y3, moistening nozzle blocked (CDS) Function test
Cleanjet
Rinse with tabs
Service 42 Y4, Care valve blocked (CDS) Rinse with tabs
Service 27 Drain valve not closing refer to fault tree
Service 25 Cleanjet pump and hose refer to fault tree
Service 44 Steam heating insucient (B1), E/2 Rinse with tabs
Service 40 Care pump and hose Rinse with tabs
Service 110 SC pump M4, level electrode Abort
Service 120 Y1, level electrode Abort
In case an error occurs, the unit will stop the cleanjet process and automatically start an internal abort cycle. At th
end of this abort cycle the error message is shown.
The same error message is shown when the user starts a cleanjet process again the next day.
To clear the error, the hardware problem must be solved and the error must be reset by the proper reset pro-
gram.
CleanJet interrupt
Should a running CleanJet program be interrupted by power failure or the unit has intentionally been switched
o, an ABORT program of approx. 27min starts automatically to bring the unit back into safe operation mode.
This ABORT program can not be shortened or aborted again but must be completed successfully.
The cabinet will be ushed with CleanJet pump M6. The steam generator will be lled with the Care valve Y4,
emptied with SC Pump M4 and then overlled with the solenoid valve lling Y1. Now the steam generator will
be emptied once again and then relled.
Finally there is a short steam phase (neutralisation of the steam generator).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rational CombiMaster Plus CMP and is the answer not in the manual?

Rational CombiMaster Plus CMP Specifications

General IconGeneral
BrandRational
ModelCombiMaster Plus CMP
CategoryCommercial Food Equipment
LanguageEnglish

Related product manuals