- 75 - V08 en, SCC
1 Switch unit ON
2 On operator PCB set DIP switch 1 to „ON“ position
3
Select service package with timer dial
and select:
Diagnostic Program
Error code history
(Gas units: GE - gas error history)
Running times
Basic settings
4 Activate with core temperature key the desired service package
5 Select with timer dial the desired step
6 Activate selected step by pressing timer key
7
To de-activate service package set DIP switch 1 to „OFF“ position.
Switch unit o and on again.
Function test
1 Switch unit ON
2 On operator PCB set DIP switch 2 to „ON“ position
3 Select service package with timer dial:
Activation of manual calibration
Function test
bini - ball valve initialization (index I); to start press core probe key.
4 Activate selected package by pressing core temperature key
5 In function test select desired step with timer dial.
6 Activate selected step with timer key.
7 Activate component with core temperature key.
8
To de-activate function test set DIP switch 2 to „OFF“ position.
Switch unit o and on again.
CM_P - Service level