EasyManua.ls Logo

RECKMANN RF90 - Page 32

Default Icon
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
Completing the forestay (R5 – R7)
28
2. Drill a hole of diameter 5.2 mm through the furling section and the top bushing half on each side
of the furling section using a drilling bit.
3. Take the top bushing halves out of the furling section and cut an M6 thread in each drill hole.
4. Stow the top bushing halves for later assembly.
5. Drill holes of diameter 6 mm in the furling section.

Table of Contents