EasyManua.ls Logo

Rlide R2 Series - Stakeout Functions; Stake Out Angle and Distance

Default Icon
159 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
h.
Press [F2] and Rotate the telescope and
alidade, and sight the center of target
prism. Press [MSR1] or [MSR2]. If not
measure on F2, press [ENT] and
proceed to Step j.
Rotate the
telescope
+
[MSR 1]/
[MSR 2]
Level point
HA#
175°1718
VD#
HD#
* Sight Press [MSR]
i.
After finishing measurement on F2, the
result is displayed, press [ENT].
[ENT]
Level point
HA#
175°1718
VD#
-0.306m
HD#
1.959m
* Press [ENT]
F2
j.
The result dialog box is displayed, press
[OK] to confirm.
To remeasure, press [Abrt].
[OK]
or
[Abrt]
Stn Setup
dHA:
0°0000
dVA:
-0°00’02
dSD:
0.001m
* Press [ENT] Rec
Abrt
CP
OK
k.
The updated station coordinates are
displayed, the height Z is updated. You
can change the HI in this screen.
N:
10.000m
E:
10.000m
Z:
6.180m
ST:
1
HI:
1.600m
l.
Press [ENT] to record the updated STN.
Screen returns to Stn Setup menu.
[ENT]
Stn Setu
1. Known
2. Rese
3. QuickStn
4. Z Coord
5. BS Check
1) About method to input PtID, please refer to2.8 METHOD TO INPUT PTID”.
When the HI is changed, the Z coordinate is updated before the station is recorded.
You must complete a station setup before you use the Height Transfer function.

Table of Contents