96
d.
Enter to the screen of Slope Stake Out
function, input prism height, collimate the
point that is to be intercepted near the
slope, and press [MSR1] or [MSR2] to
start slope stake-out. The system will
select an appropriate slope from the data
input in last Step. Suppose to set the
height of measurement point as the
horizontal datum plane, calculate the
intercepted point. The list displays the
offset between measurement point and
calculated point.
[MSR1]/
[MSR2]
Slope SO
HD:
* Sight Press [MSR]
e.
The method to stake out slope is similar
to that of point stake-out. When both
second line and third line are zero, it
indicates that the stake-out point is found.
Slope SO
R:
12.667m
Out:
9.212m
HD:
2.221m
* Sight Press [MSR]
f.
After finishing staking out this point, press
[ESC] to return to the main screen of
Slope Stake Out, input other slope to be
staked out to proceed the stake-out of
next slope via the same approach.
Select (Left) or (Right)
Cut L:
1.000m
Fill L:
2.000m
Cut R:
2.000m
Fill R:
3.000m
Left
Right
Note:
1) If the earth surface crosses the hinge point, the intersection cannot be calculated.
2) As the fill/dig value of calculated point is zero, therefore the fill/dig value is not displayed.