EasyManua.ls Logo

Roche Cedex Bio System - Page 490

Roche Cedex Bio System
496 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
F-20 Operator’s Manual · Version 3.1
Index Cedex Bio System
screens
– QC history, A–99
– QC history graph, A–100
– QC list, A–98
– QC status, A–98
– reagent mixing, A–111
– reagent status, A–90
–result list, A–96
– sample overview, A–84
– scrolling, A–73
– stopping processing, A–116
– system status, A–92
– test selection, A–86
–test status, A–87
– users, A–115
– worklist, A–104
scrolling, A–73
segments of cuvettes, A–55
selecting groups of list items
– See, filtering.
selecting, tests to be calibrated, B–62
sensors, ISE, E–11
sequence of processing, B–145
service representative, contacting, C–27
setting up, order definition, B–37
sheets, barcodes, B–90
shift
– finishing, B–77
– starting, B–10
short guides
– analyzing samples, B–35
– calibration, B–60
– End of Shift, B–78
– ISE Prepare phase, E–20
– Prepare phase, B–13
–QC, B–69
shutting down the system
– end of shift, B–88
– stop option, A–116
software
– importing, B–113
– updating, B–113
software data handling, specifications, A–66
solutions, ISE, E–8
special characters, A–76
specifications, technical, A–65
spillages, safety, A–9
standby, ISE status, E–12
starting
– a run, B–44
– processing, B–44
–shift, B–10
STAT orders, B–41
status
– cuvettes, B–28
– instrument, B–46
– ISE unit, E–69
– reagent sets, B–23
– sample tubes, B–44
– standby for ISE, E–12
– system, A–34
stop, screen, A–116
stopping
– printing, A–78, B–58
– processing, B–49
– run, B–49
storage facilities, specifications, A–66
switching
– between upper and lower-case, A–75
–off, B–88
– on, B–10
symbols, –6
syringe
– assembly, A–46
– hardware, A–46
system
– definitions, B–166
– logging on, B–11
– preparing, B–12
– preparing ISE, E–20
– See also, instrument.
system status
– overview, A–34
– screen, A–92
systems
–fluid, A–45
– See also, units, assemblies.
T
tabs, B–119
– assigning tests, B–119
– Overview, A–82
– removing tests, B–120
– Utilities, A–105
–Workplace, A–94
technical specifications, A–65
test panels
– assigning tests, B–119
test selection, screen, A–86
test status, screen, A–87

Table of Contents