Operating Instructions Combics CAIXS2 9
Getting Started
Preparing the Cable
t Strip approx. 14 cm from the end of the cable.
t Shorten the shielding to approx. 2 cm and pull back over the insulation.
t Strip approximately 5 mm of the insulation from the wires of the connecting
cable and affix ferrules to the wire ends.
Attaching the Cable Entry
Please use extreme caution when performing any work on the equipment that
affects this cable gland.
You must use a torque wrench.
The torque for this cable gland is 5 Nm.
4
1
5
t Remove the protective caps from the bore hole on the indicator.
t Insert the included cable gland through the bore hole and secure from the
inside using the locknut (1).
t Insert the cable through the cable gland until the shielding (2) comes into
contact with the clamps (3). Tighten the screw-down nut (4) until the gasket
(5) inserted between the screw-down nut and cable forms a small beaded rim.
t Check the shielding and clamps.
t Securely connect the wires of the connecting cable in accordance with the
terminal assignments.
Connecting the Cable to the Analog/Digital Converter (ADC)
t Insert all cable wires through the ferrite case, wind them around the ferrite case
and then reinsert back through the ferrite case.
t Screw the wires tightly into the clamps.
Pin Assignment
t Refer to the data sheet or operating instructions of the weighing platform for
details on the assignment of wire colors/signals. Ensure any lines that are not
assigned are insulated correctly.
Connect weighing platform to ADU, Option A15
1 EXC+ blue
2 Sense+ green
3 OUT+ white
4 OUT- red
5 Sense- gray
6 EXC- black
t When connecting a load receptor that uses 4-conductor technology (the cable
of the weighing platform to be connected only has 4 lines), connect clamp
pairs 1 and 2 (EXC+ and SENSE+), and 5 and 6 (SENSE- and EXC-) with a wire
jumper.