EasyManua.ls Logo

SEA SETRONIK1 - System Commissioning Steps

SEA SETRONIK1
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SEA SYSTEMS
INSTALLATION AND USE MANUAL
CONTROL PANEL and PREWIRED SYSTEM STK1
For Electric and Hydraulic Lifts
MSTK12-GB
Rev.01
30/12/05
SETRONIK1 Pagina 24 di 54
2.9.SYSTEM COMMISSIONING
1. Make sure that the maintenance push-button panel switch placed on the car roof is set
to NORMAL;
2. Turn ON the control panel and ascertain that the following leds are switched ON:
1, 2, 8, 10, CM, 01, +5 (in case of Hydraulic lift also TC and PST);
3. Should any problems arise (ex: alarmed card: ALL leds ON), refer to Paragraph 6:
Basic Troubleshooting Procedures.

Related product manuals