Operating Instructions Chapter 5
C 4000 Standard/Advanced
8 009 861/OE59/19-11-04 © SICK AG • Industrial Safety Systems • Germany • All rights reserved
43
Installation and mounting
Mount the bolts marked with to on the operator side of the system to ensure that
they remain accessible after mounting and to allow you to readjust the light curtain later,
if necessary.
If you wish to use the additional front screen (see “Additional front screen (weld spark
guard)” on page 88), make sure that the curved side of the device remains accessible
after mounting.
Fig. 25: Mounting sender and
receiver using swivel mount
brackets
Notes