Appendix
A.4 Handling STARTER
Converter with control units CU250D-2
344 Operating Instructions, 04/2014, FW V4.7, A5E34261542B AA
After the basic commissioning, you can adapt the inverter to your application as described in
the Commissioning guidelines (Page 55).
STARTER offers two options:
● Change the settings using the appropriate screen forms -
.
① Navigation bar: For each inverter function, select the corresponding screen form.
② tabs: Switch between screen forms.
If you change the settings using screen forms you do not need to know the parameter
numbers.
● You change the settings using the parameters in the expert list.
If you wish to change the settings using the expert list, you need to know the
corresponding parameter number and its significance.