Commissioning
5.2 Preparing for commissioning
Converter with control units CU250D-2
Operating Instructions, 04/2014, FW V4.7, A5E34261542B AA
57
5.2
Preparing for commissioning
Overview
Before starting commissioning, you must know the answer to the following questions:
Inverter
What are the data specifications of my inverter?
SINAMICS G120D CU250D-2 Inverter (Page 23).
What inverter interfaces are active?
Connections and cables (Page 36).
How is the inverter integrated in the higher-level control system?
What technological requirements must the drive fulfill?
Introduction, V/f control, vector control (Page 58).
Defining additional requirements for the application (Page 60).
Motor
Which motor is connected to the inverter?
If you are using one of the STARTER commissioning tools or Startdrive and a SIEMENS
motor, then you only need the order number of the motor. Otherwise, note down the data
on the motor rating plate.
In which region of the world will the motor be used?
- Europe IEC: 50 Hz [kW]
- North America NEMA: 60 Hz [hp] or 60 Hz [kW]
How is the motor connected?
Pay attention to the connection of the motor (star connection [Y] or delta connection [Δ]).
Note the appropriate motor data for connecting.
What is the ambient temperature of the motor?
For commissioning, you will need the ambient temperature of the motor if it differs by
more than 10 °C from the factory setting (20 °C).