Commissioning
5.5 Basic commissioning with STARTER
Converter with control units CU250D-2
Operating Instructions, 04/2014, FW V4.7, A5E34261542B AA
69
Generating a STARTER project
Procedure
In order to create a new project, proceed as follows:
1. In the STARTER menu, select "Project" → "New…".
2. Specify a name of your choice for the project.
You have created a new STARTER project.
Transfer inverters connected via USB into the project
Procedure
Proceed as follows to transfer an inverter connected via USB into your project:
1. Switch on the inverter power supply.
2. First insert a USB cable into your PC and then into the inverter.
3. The PC operating system installs the USB driver when you are connecting the inverter
and PC together for the first time.
– Windows 7 installs the driver automatically.
– For Windows XP you must acknowledge several system messages.
4. Start the STARTER commissioning software.
5. In STARTER, press the
("Accessible nodes") button.
6. When the USB interface is appropriately set, then the "Accessible nodes" screen form
shows the inverters that can be accessed.
If you have not correctly set the USB interface, then the following "No additional nodes
found" message is displayed. In this case, follow the description below.
7. Select the inverter ☑.
8. Press the "Accept" button.
You have transferred an inverter accessible via the USB interface into your project.