5 Mounting
SMA Solar Technology AG
Operating manual EVC22-3AC-20-BE-en-10 33
CAUTION
Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or
mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Wear suitable personal protective equipment for all work on the product.
Procedure:
1. Disconnect the circuit breaker for all line conductors and secure against reconnection.
2. There are three options for routing the AC
connection cable and the communication cable to
the product (top, bottom, and rear). Decide on one
option before drilling.
3. Align the wall mounting bracket horizontally on the wall and mark the position of the drill
holes.
4. Set the wall mounting bracket aside and drill the marked holes.
5. Insert screw anchors into the drill holes if the support surface requires them.
6. For option A, run the AC connection cable and the
communication cable through the wall mount and
position the wall mount above the drilled holes.