QA BEAMCHECKERâ„¢ PLUS 42
12. Deliver the selected plan to the QA BeamChecker Plus. Upon detecting signal, the QA
BeamChecker Plus will begin measurement, and the Connection Status bar will alternate
between green and yellow. Once the exposure is completed, raw measured values,
temperature, pressure, and baseline parameters are shown.
Delivery specific measurements will be shown including lateral profile, output reference, and
energy measurement for static plans, and temperature corrected measurements for the
center, left, and right chambers for dynamic plans. Percentage differences from the baseline
will also be shown along with a status color code:
Green Within action level 1
Yellow At or outside of action level 1
Red At or outside of action level 2
Real-Time Operation results from Dynamic and Static modes respectively
13. If desired, add a comment in the provided field. When the measurement is saved, this
comment will be accessible in the Data View.
14. Click Save Results to save this measurement directly to the database or Reset to clear
values and re-arm for the next measurement.
15. Repeat steps 12-13 if not switching to a different plan, otherwise continue from step 11.
16. Once completed, the acquired measurements can be viewed for analysis. For instructions,
see the Data View and Downloading Measurements section of this manual.
8 Data View, Downloading Measurements and Reporting
When data has been acquired by the QA BeamChecker Plus in either Wire-Free or Real-Time
Operation modes, selecting the Data View tab allows the data to be viewed in detail.