5.1.2 Reforming before commissioning
If reforming is not possible every year, institute reforming on stored devices before
commissioning. Note that the voltage levels depend on the storage time.
The following graphic shows the predominant supply connection.
X10
L1
F1
PE
L1 L2
T2
T1
PE
L3
L2
L3
L1–L3 Lines 1 to 3
N Neutral conductor
PE Grounding conductor
F1 Fuse
T1 Variable transformer
T2 Drive controller

Table of Contents

Other manuals for Stober SC6 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Stober SC6 Series and is the answer not in the manual?

Stober SC6 Series Specifications

General IconGeneral
BrandStober
ModelSC6 Series
CategoryController
LanguageEnglish

Related product manuals