EasyManua.ls Logo

Stryker Power-PRO 2 - Installation; Installing the cot fastener; Installing the in-fastener shut-off

Stryker Power-PRO 2
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IInnssttaallllaattiioonn
IInnssttaalllliinngg tthhee ccoott ffaasstteenneerr
The Stryker cot fastener systems are compatible only with cots that conform to the installation specifications.
WWAARRNNIINNGG
Always install the cot fastener by qualified personnel only. Improper installation could result in injury to the patient or
operator.
Always make sure that all cots meet the installation specifications for the Stryker cot fastener system.
Always adjust the rail clamp assembly to match the cot retaining post position for the cot manufacturer and model
number.
These instructions are intended for cots with antler style cot fastener systems. For crash-rated cot fasteners, see the
appropriate Operations Manual for installation instructions.
IInnssttaalllliinngg tthhee iinn--ffaasstteenneerr sshhuutt--ooffff
These instructions are intended for cots with antler style cot fastener systems. For crash-rated cot fasteners, see the
appropriate Operations Manual for installation instructions.
WWAARRNNIINNGG
Always position the in-fastener shut-off before you place the cot into service.
Do not attempt to operate the cot when loaded into a cot fastener.
Always use the in-fastener shut-off to disable the electronic functionality only.
Always install the in-fastener shut-off system (if not using a crash-rated cot fastener) in any emergency vehicle that will
be used with this cot.
The cot and antler style cot fastener system have an integrated in-fastener shut-off function that disables the cot motor
when you secure the cot into the cot fastener. Tighten the bolts to secure the fastener before you install the shut-off bracket.
Install the shut-off bracket onto the rail clamp assembly before you place the cot into service.
1. Raise the base and push the cot into the vehicle patient compartment. Follow appropriate loading instructions.
2. Secure the extended head section of the cot into the cot fastener antler.
3. Secure the cot post into the fastener rail clamp.
4. Adjust the shut-off bracket along the rail clamp until the diamond (A) on the outer rail label is centered between the pop
rivet heads (B) on the in-ambulance shut-off (Figure 3).
5. Using a T27 Torx driver, securely fasten the bolts to attach the shut-off bracket to the rail clamp assembly.
6. Press the retract (-) button to check that the motor does not turn on while the cot is in the fastener. The cot battery LED
indicator will still illuminate. If the motor turns on, readjust the shut-off bracket.
6507-009-001 Rev AB.3 19 EN

Table of Contents

Related product manuals