EasyManua.ls Logo

Suzuki LT-A750X/P - Page 136

Suzuki LT-A750X/P
711 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1A-63 Engine General Information and Diagnosis:
Step Action Yes No
1 1) Remove the left side cover. Refer to “Front Side Exterior
Parts Removal and Installation in Section 9D (Page 9D-
6)”.
2) Turn the ignition switch OFF.
3) Check the ISC valve coupler for loose or poor contacts.
If OK, then check the ISC valve lead wire continuity.
4) Disconnect the ISC valve coupler.
5) Check the continuity between terminals “A” and “34”,
terminals “B” and “4”, terminals “C” and “17”, terminals
“D” and “33”, terminals “E” and “4” and terminals “F” and
“16”.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
Tester knob indication
Continuity test ( )
ECM coupler (Harness side)
Is the continuity OK?
Go to Step 2. B/Lg, R/B, P/W, G or W/
Bl wire open.
I831G1110063-01
(A)
“17”
“34”
“A”
“B”
“C”
“4”
I831G1110064-02
(A)
“33”
“16”
“4”
“D”
“E”
“F”
I831G1110065-02

Table of Contents

Related product manuals