3D-2 Propeller Shafts:
4) Remove the front output shaft (1) from the right
crankcase.
Installation
Install the front output shaft in the reverse order of
removal. Pay attention to the following point:
• Apply engine oil to the front output bearing (rear).
• Apply a small quantity of grease to the O-ring (1).
CAUTION
!
Replace a O-ring (1) with a new one.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
• Install the front output shaft to the right crankcase.
Tighten the front output shaft bolts.
Front Output Shaft Disassembly and Assembly
B831G23406003
Refer to “Front Output Shaft Removal and Installation
(Page 3D-1)”.
Disassembly
1) Remove the C-ring (1) and snap ring (2).
Special tool
: 09900–06107 (Snap ring pliers)
2) Remove the front drive collar (3), front drive output
shaft housing (4) and O-ring (5).
1
I831G1340003-02
I831G1340097-01
1
I831G1340098-01
I831G1340004-02
1
2
I831G1340005-02
4
5
3
I831G1340006-02