EasyManua.ls Logo

Suzuki LT-A750X/P - Page 674

Suzuki LT-A750X/P
711 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power Assisted Steering System: 6C-28
2 1) Turn the ignition switch OFF.
2) Connect the torque sensor coupler.
3) Insert the needle-point probes to lead wire coupler.
4) Turn the ignition switch ON.
5) Measure the voltage between G wire “A” and B wire “B”
by turning the handlebars left and right.
Special tool
(A): 09900–25008 (Multi circuit tester set)
(B): 09900–25009 (Needle-point probe set)
Tester knob indication
Voltage ( )
Torque sensor (main) voltage
Handlebars is left turn: Approx. 3.0 V
Handlebars is right turn: Approx. 2.0 V
Is voltage OK?
Replace the EPS
control unit with a
known good one, and
inspect it again. Refer
to “EPS Control Unit
Removal and
Installation (LT-
A750XP/ZK9)
(Page 6C-48)”.
R wire terminal or G
wire terminal circuit
open (torque sensor
side).
If check result is not
satisfactory, replace
the torque sensor
(EPS body assembly)
with a new one. Refer
to “EPS Body
Assembly Removal
and Installation (LT-
A750XP/ZK9)
(Page 6C-50)”.
Step Action Yes No
(A)
“A”
“B”
(B)
(B)
I931G3630025-01
I931H1630042-01

Table of Contents

Related product manuals