EasyManua.ls Logo

Suzuki RV125 - Remounting

Suzuki RV125
251 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-6 CHASSIS
Remove the wheel bearings by using the special tool.
! 09921-20240: Bearing remover set
"
AXLE SHAFT
Measure the front axle runout using the dial gauge.
If the runout exceeds the service limit, replace the front axle.
# Front axle runout
Service Limit: 0.25 mm
! 09900-20606: Dial gauge (1/100 mm)
09900-20701: Magnetic stand
09900-21304: V-block set (100 mm)
TIRE ($5-50)
REMOUNTING
Reassemble and remount the front wheel in the reverse order of
removal and disassembly. Pay special attention to the following
points:
WHEEL BEARINGS
Apply SUZUKI SUPER GREASE to the bearings before
installing.
% 99000-25010: SUZUKI SUPER GREASE “A
Install the wheel bearings using the special tools as described
below.
! 09941-34513: Bearing installer set
"
Replace the removed bearing with a new one.
* First install the right wheel bearing, then install the
left wheel bearing.
* The sealed cover on the bearings must face to the
outside.

Table of Contents

Related product manuals