EasyManua.ls Logo

Suzuki RV125 - Engine Installation

Suzuki RV125
251 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-8 ENGINE
ENGINE INSTALLATION
Reinstall the engine in the reverse order of engine removal.
Install the engine mounting bolts and nuts as shown in the following illustration.
Tighten the engine mounting nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of any
use.
"
Tighten the engine sprocket nut
1 to the specified torque.
# Engine sprocket nut: 90 N·m (9.0 kgf-m)
Left
Right
40 N
.
m
(4.0 kgf-m)
65 N
.
m
(6.5 kgf-m)
40 N
.
m
(4.0 kgf-m)
41 N
.
m
(4.1 kgf-m)
41 N
.
m
(4.1 kgf-m)
88 N
.
m
(8.8 kgf-m)
The drive chain joint clip should be attached in the
way that the slit end will face opposite to the direction
of travel.

Table of Contents

Related product manuals