EasyManua.ls Logo

Suzuki RV125 - CHASSIS BOLTS AND NUTS

Suzuki RV125
251 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-20 PERIODIC MAINTENANCE
CHASSIS BOLTS AND NUTS
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-21 for the loca-
tions of the following bolts and nuts on the motorcycle.)
Tighten initially at 1 000 km (5 months) and every
4 000 km (20 months) thereafter.
Item N·m kgf-m
1 Handlebar clamp bolt 23 2.3
2 Steering stem head nut 90 9.0
3 Front fork upper clamp bolt 23 2.3
4 Front fork lower clamp bolt 33 3.3
5 Front fork cap bolt 23 2.3
6 Front axle 65 6.5
7 Front axle pinch bolt 23 2.3
8 Front brake caliper mounting bolt 39 3.9
9 Front brake hose union bolt 23 2.3
0 Front brake caliper air bleeder valve 7.5 0.75
A Front brake master cylinder mounting bolt 10 1.0
B Swingarm pivot nut 65 6.5
C Rear axle nut 65 6.5
D Rear shock absorber mounting bolt/nut
(Upper & Lower)
50 5.0
E Front footrest bolt 94 9.4
F Rear brake cam lever nut 7 0.7
G Rear sprocket mounting nut 60 6.0
H Spoke nipple 4.5 0.45

Table of Contents

Related product manuals