76
8
SYSTEMA EOLO RT rev. 09ENIT04052021
COLLAUDO
0
5
10
15
20
25
100 200 300 400 500 600 700800 9001000
f [mm]
L [mm]
8.7 TENSIONING THE TRANSMISSION BELTS
Before commissioning of the appliance,
always check the direction of rotation of the
motors without load. To do this, remove the
V-belts by rst unlocking the four screws in
the motor base (g. 8.10).
If the rotation is di󰀨erent from the desired
direction, disconnect the power supply and
invert the two power supply phases, thus
setting the correct direction of rotation. Put
the V-belts back and check that the pulleys
are aligned, as in g. 8.12.
V-belt tensioning method:
loosen screws 1-4 in the motor base;
using screw 5, adjust the tension of the
V-belts appropriately (see graphic g.
8.11);
tighten screws 1-4 blocking the motor
base.
Locking screw 1-4
Tension screw 5
Fig. 8.10 Operating method for adjusting the tension of the
straps
To nd the proper tensioning of the belts, use the following formula:
Fig. 8.12 Dimension symbols for the diagram of the
belt tensioning force.
Fig. 8.11 Diagram of the tensioning force of the
straps
L [mm] / f [mm] = 20
When starting the devices for the rst time, check the
tensioning of the V-belts after 2-4 working hours. If ne-
cessary, correct as described
ATTENTION
All belt tensioning operations must be carried out with the appliance switched o󰀨,
disconnected from the power supply.

Table of Contents