Getting started
Initial product inspection
Perform the following product inspection procedure when you receive your
instrument:
1. Inspect the shipping carton for external damage, which may indicate damage
to the instrument.
2. Remove the TG8000 generator from the shipping carton, and then check
that the instrument has not been damaged in transit. Prior to shipment the
instrument is thoroughly inspected for mechanical defects. The exterior
should not have any scratches or impact marks.
NOTE. Sav
e the shipping carton and packaging materials for instrument
repackaging in case shipment b ecomes necessary.
3. Verify t
hat the shipping carton contains the basic instrument, all modules
you ordered, the s tandard accessories and any optional accessories that you
ordered listed in the table. (See Table 1-1.)
Contact your local Tektronix Field Office or representative if there is a problem
with your instrument or if your shipment is incomplete.
To install the mainframe
This section provides installation information for the TG8000 mainframe.
Module installation
The
TG8000 mainframe is shipped with the generator modules that you ordered
already installed and configured. You can add or remove modules as necessary for
your application. (See page 1-11, Module installation and removal.)
1–6 TG8000 Multiformat Test Signal Generator User Manual