EasyManua.ls Logo

Tokheim QUANTIUM 410 - Pipework - VR; New Submerged Installation

Tokheim QUANTIUM 410
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 5-14 Document Ref 909342-001 Rev 11
Installation Quantium 410 Installation Manual
5.5.6 PIPEWORK - VR
The Installer is responsible for supplying the VR pipe to the heights given in
section 2.3.
1) Fit the VR flange and gasket to the VR pipe.
2) As required, fit optional flame arrestor, quick connector and/or shear valve kits
to the VR pipe flange, sealing with gaskets, o-rings, dowty seals and washers as
supplied.
3) Ensure that the VR flexi pipes are not put under strain, trapped or twisted then
connect VR flexi pipe to the VR pipe.
5.5.7 NEW SUBMERGED INSTALLATION
Depending on the dispenser an additional plate at the end of the hydraulic cabinet
to balance the dispenser during installation may be required. This is fitted in
production on specific configurations only, it is left in place once the dispenser is
installed.
Description of Parts
4) When the filter is firmly in place, turn the ball valve to
the open position. (Vertical). The procedure is now
complete.
Note : Ensure that the line is subsequently bled
to release any air in the sytem.
Submerged
Filter
Assembly
Nefit Nut
Driptray
Shear
Valve
Nefit Pipe

Table of Contents

Related product manuals