EasyManua.ls Logo

Toro Multi Pro 1750 - Page 64

Toro Multi Pro 1750
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstallingtheRateControl
ManifoldValve
1.Alignagasketbetweentheangesoftherate
controlvalvemanifoldandthepressurelter
head(Figure75A).
Note:Ifneeded,loosenthemountinghardware
forthepressurelterheadasneededtoprovide
clearance.
g033311
Figure75
1.Locknut(1/4
inch)
5.Gasket9.Coupling
(manifold-valve)
2.Valvemount6.Flangeclamp
10.Socket(outlet
tting)
3.Flange
(agitation-valve)
7.Flange
(pressurelter
head)
11.Retainer
4.Flanged-head
bolt(1/4x3/4
inch)
8.Flange(rate
controlvalve)
2.Assembletheratecontrolvalvemanifold,
gasket,andpressurelterheadwithaange
clampandtightenbyhand(Figure75A).
3.Alignagasketbetweentheangesoftherate
controlvalveandtheagitation-valvemanifold
(Figure75A).
4.Assembletheratecontrolvalvemanifold,
gasket,andagitation-valvemanifoldwitha
angeclampandtightenbyhand(Figure75A).
5.Assembletheratecontrolvalvetothevalve
mountwiththe2anged-headboltsand2
angedlocknuts(Figure75A)thatyouremoved
instep3ofRemovingtheRate-Control-Manifold
Valve(page59)andtorquethenutandboltto
10to12N∙m(90to110in-lb).
6.Assembletheoutletttingontothecoupling
ttingatthebottomofthemanifoldfortherate
controlvalve(Figure75B).
7.Securetheoutletttingcouplingttingby
insertingaretainerintothesocketoftheoutlet
tting(Figure75B).
8.Ifyouloosenedthemountinghardwareforthe
pressurelterhead,tightenthenutandboltto
10to12N∙m(90to110in-lb).
InstallingtheAgitation-Manifold
Valve
1.Aligntheangeoftheagitation-valvemanifold,
1gasket,andtheangeoftheagitation-bypass
valve(Figure76A).
Note:Ifneeded,loosenthemountinghardware
forthemaster-sectionvalveasneededto
provideclearance.
64

Table of Contents

Other manuals for Toro Multi Pro 1750

Related product manuals