EasyManua.ls Logo

Toshiba E-STUDIO4508A - Page 526

Toshiba E-STUDIO4508A
1016 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
e-STUDIO2008A/2508A/3008A/3508A/4508A/5008A © 2015 TOSHIBA TEC CORPORATION All rights reserved
PREVENTIVE MAINTENANCE (PM)
7 - 42
*l Stapler carrier shaft
Apply an adequate amount of white grease (Molykote EM-30L) to the entire stapler carrier shaft [1].
Fig. 7-38
*m Rack gear (Aligning plate)
*n Finishing tray shaft
1. Take off the junction box unit. (Refer to “MJ-1106 Service Manual chapter4.)
*If the hole punch unit is installed, take it off beforehand.
2. Apply oil as follows through the opening which shows up when the junction box unit has been
removed.
Apply an adequate amount of white grease (Molykote EM-30L) to the gear teeth of the rack gear [1]
which drive the aligning plate, and the entire finishing tray shaft [2].
Fig. 7-39
[
1
]
[
1
]
[
2
]

Table of Contents

Other manuals for Toshiba E-STUDIO4508A

Related product manuals