3-1 
 
 
 
This chapter describes connecting field wiring for all devices (smoke detectors, releasing 
appliances, abort switches, etc.) to the AutoPulse Z-10, and wiring AC power to the panel. 
 
Before installing any equipment, always make a survey of the area to be covered.  Also, be sure to 
follow the requirements of applicable codes and standards, as well as the directives of Authorities 
Having Jurisdiction (AHJs). 
 
Remove the plastic PCB cover as described in “Removing Plastic PCB Cover” in the previous 
chapter. 
 
Refer to the page number listed in this table for information on a specific topic. 
 
Topic  See Page # 
Wiring Initiating Device Circuits  3-2 
Wiring Releasing Circuits  3-5 
Wiring Special Purpose Monitor Circuits  3-8 
Wiring Relay Connections  3-11 
Wiring Notification Appliance Circuits  3-12 
Wiring AC Power and Battery Wiring  3-14 
Wiring 24V Aux Power  3-17 
Testing Circuit Supervision  3-18 
 
 
 
 
 
 
 
 
 
 
 
Chapter 3 
Connecting Field Wiring 
and AC Power 
Introduction 
In this Chapter