EasyManua.ls Logo

VDO CTC II - Manual Measured Track

VDO CTC II
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CTC II The steps involved in measuring and testing
Operating Instructions Road measurement
40 © Continental Trading GmbH A2C59512809
6.1.2 Manual Measured Track
1 Press to start the "Manual measuring track" menu.
The CTC II reads the tachograph type.
,
2 Drive up to the start mark.
Stop the vehicle if the pulse changes.
Orient the test track pointer on the start mark of the
measured track.
3 Start the measurement procedure.
Drive at a steady walking speed along the measured track.
4 After passing the end marker (if the pulse changes), stop the
vehicle and the measurement procedure.
5 Use a measuring tape to measure the track.
6 Enter the measured track length and confirm.
7 Press to adjust the K value to match the determined W value.
The CTC II programs the determined W value in the
tachograph.
Remark:
The K value may deviate by ± 2 imp/km from the determined
W value, due to electronic splitting.
8 End the program.
If the determined characteristic coefficient "W" deviates by
±1% from the set device constant, the K value must be
adjusted accordingly.
Important

Table of Contents

Other manuals for VDO CTC II