13 Volumetric Line Leak Tests Leak Test Start Time
13-4
To set the date of the weekly test, press CHANGE until the day on which you want to perform the test appears.
Press ENTER to confirm the date:
Press STEP to continue. The system displays the START TIME message. Follow the procedure under “Leak Test
Start Time” on page 13-4.
DAILY TEST
To run the tests daily, press CHANGE four times, then press ENTER in response to the ON DATE message:
The system displays the message:
Press STEP to continue. The system displays the START TIME message. Follow the procedure under below.
Leak Test Start Time
If necessary, press STEP until you see the message:
You can enable the test by entering a start time or leave the test disabled.
To leave the test disabled, press STEP. (The system displays the TEST RATE message.)
To enter a test start time, press CHANGE in response to the START TIME message. Enter the start time and press
the Right Arrow key to select AM or PM. Press ENTER to confirm your entry:
NOTE: The system automatically establishes the correct test length.
Press STEP to continue.
Leak Test Rate
If necessary, press STEP until you see the message:
DAY
PRESS <STEP> TO CONTINUE
ALL LINES:
ON DATE
TEST DAILY: ALL LINES
PRESS <STEP> TO CONTINUE
START TIME: ALL LINES
TIME: DISABLED
TIME: XX:XX XM
PRESS <STEP> TO CONTINUE
TEST RATE: ALL LINES
0.20 GAL/HR

Table of Contents

Other manuals for Veeder-Root TLS-300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Veeder-Root TLS-300 and is the answer not in the manual?

Veeder-Root TLS-300 Specifications

General IconGeneral
BrandVeeder-Root
ModelTLS-300
CategoryMusic Mixer
LanguageEnglish

Related product manuals