EasyManua.ls Logo

Vertiv Liebert CRV - Page 149

Vertiv Liebert CRV
194 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Water-cooled Condensers (if equipped)
1. Verify proper water maintenance/treatment is being performed
2. Check water-regulating valve (motorized ball valve) operation
3. Verify water flow
4. Clean screen on Y strainer (if equipped)
5. Cap tubes (not rubbing)
6. Check condenser and supply/return lines/connections for water/glycol leaks
7. Entering water temperature _______
8. Leaving water temperature ________°
Drycooler (if equipped)
1. Coil clean free of debris
2. Motor mounts tight
3. Bearings in good condition (motor)
4. Piping support/clamps secure
5. Check/Re-torque wire connections
6. Check contactors for pitting (replace if pitted)
7. Check fuses
8. Verify fan operation
9. Check surge-protection device status-indicator lights (if equipped)
10. Stat Settings ________________________
11. Glycol level
12. Glycol solution ----__________________%
13. Water/Glycol solution flowing continuously/clean and free of debris
14. Water-treatment plan established and followed for open cooling-tower application
15. Check refrigerant/glycol lines for signs of leaks/repair as found
16. Motor amp draw
#1 L1 L2 L3
#2 L1 L2 L3
#3 L1 L2 L3
#4 L1 L2 L3
#5 L1 L2 L3
#6 L1 L2 L3
#7 L1 L2 L3
#8 L1 L2 L3
#9 L1 L2 L3
#10 L1 L2 L3
Vertiv | Liebert CRV Installer/User Guide | 149

Table of Contents

Other manuals for Vertiv Liebert CRV

Related product manuals