EasyManua.ls Logo

Vertiv Liebert CRV - Default Chapter; Table of Contents

Vertiv Liebert CRV
194 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
7
13
13
13
14
15
17
17
17
19
20
20
20
21
22
24
25
26
27
27
1 Important Safety Instructions
2 Nomenclature and Components
2.1 Model-number Nomenclature
2.2 Component Location
2.3 Liebert CRV Description
2.4 Vertiv SmartRow Micro-Data Center Solution
3 Pre-installation PreparationandGuidelines
3.1 Planning Dimensions
3.2 Unit Weights
4 Equipment Inspection and Handling
4.1 Packaging Material
4.2 Handling the Unit while Packaged
4.2.1 Moving 600-mm (24-in. Models Using Rigging
4.3 Removing Packaging from 600-mm(24-in. Unit
4.4 Removing 600-mm (24-in. Models from the Skid
4.4.1 Reattaching Baffle Panel—600mm (24 in.
4.5 Removing Packaging from 300-mm (12-in. Unit
4.6 Removing 300-mm (12-in. Models from the Pallet
5 Installing in Enclosure Row
5.1 Adjusting Base Supports/Leveling Feet
5.2 Optional Tie-down Brackets for 300-mm (12-in. Units
29
5.2.1 What’s Included 29
5.2.2 Tools Required 30
5.2.3 Installing Tie-down Brackets on300-mm(12-in.) andonCabinetsofDifferentHeights 30
5.2.4 Installing Tie-down Brackets on300-mm(12-in.) andonCabinetsoftheSameHeight 31
6 Piping and Refrigerant Requirements 33
6.1 Refrigerant Piping and Charging 34
6.1.1 Refrigerant Piping Guidelines for Air-cooled Systems 35
6.2 Piping Guidelines for Liebert MC Condensers 36
6.2.1 Piping Layout and Condenser Positioning 37
6.2.2 Top or Bottom Connection for Refrigerant Piping onAir-cooled Units 38
6.2.3 Heat-rejection Line Sizes and Equivalent Lengths 39
6.2.4 Refrigerant Charge Requirements for Air-cooled Systems 40
6.2.5 Evacuation, Leak-testing, and Charging Air-cooled Systems without Receivers 43
6.2.6 Evacuation, Leak-testing, and Charging Air-cooled Systems withLiebertLee-Temp
“Flooded-condenser Head-pressureControlSystem 47
6.2.7 Superheat and Refrigerant Charge Optimization 50
6.3 Fluid Piping forAir-cooled, Water/Glycol-cooledandChilled-waterPipingApplications 51
6.3.1 Water/Glycol Loop Piping Guidelines 51
6.3.2 Chilled-water Loop Piping 56
6.3.3 Humidifier Water-supply Line requirements 58
Vertiv | Liebert CRV Installer/User Guide | 3

Table of Contents

Other manuals for Vertiv Liebert CRV

Related product manuals