EasyManuals Logo

Vertiv NetSure 7100 Series Installation Manual

Vertiv NetSure
7100 Series
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
Vertiv | NetSure 7100 Series -48V DC Power System Installation Manual (IM582127000) | Rev. BB
42
Figure 17:
Installing a Battery Tray Mounting Kit P/N 565004 (cont’d from next page)
9. Mount the AC guard to the cabinet.
10. Remove the existing AC guard if the power system
distribution is shorter than 4-row. Save 8-32 x 3/8
screws.
11. Install AC guards provided with kit and saved
8-32 x 3/8 screws.
12. Torque to 20 in-lbs.

Table of Contents

Other manuals for Vertiv NetSure 7100 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv NetSure 7100 Series and is the answer not in the manual?

Vertiv NetSure 7100 Series Specifications

General IconGeneral
BrandVertiv
ModelNetSure 7100 Series
CategoryPower Supply
LanguageEnglish

Related product manuals