Inspection Area Inspection Points Corrective Action Checked
Air Duct
Inspect air intake and exhaust openings. They must be
free from obstruction and properly installed.
Visually inspect the area.
Clear obstructions and clean air duct as required.
Display Periodic Inspection
Digital Operator
Make sure data appears on the display properly.
Inspect for dust or other foreign material that may have
collected on surrounding components.
Contact the nearest sales office if there is any
trouble with the display or keypad.
Clean the digital operator.
6.1 Inspection
158
YASKAWA ELECTRIC TOEP YAIP1U 01B YASKAWA AC Drive - P1000 Quick Start Guide

Table of Contents

Other manuals for YASKAWA P1000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YASKAWA P1000 and is the answer not in the manual?

YASKAWA P1000 Specifications

General IconGeneral
Operating Temperature-10°C to +50°C (14°F to 122°F)
Cooling MethodFan Cooled
Output Voltage0-Input Voltage
Output Frequency0-400 Hz
Frequency Range0.1-400 Hz
Power Rating0.4 kW to 630 kW
Control MethodV/f Control
Overload Capacity150% for 60 seconds
Protection FunctionsOvercurrent, Overvoltage, Undervoltage, Overheat, Short Circuit, Ground Fault
Protection FeaturesElectronic Thermal Overload Protection
CommunicationModbus RTU
Communication InterfaceRS-485
Humidity5% to 95% (non-condensing)
AltitudeUp to 1000m (3280ft) without derating
Enclosure RatingIP20