EasyManua.ls Logo

3D Systems ProX DMP 200 - Chiller Filter Replacement

3D Systems ProX DMP 200
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
923D SYSTEMS, INC.
Chiller lter replacement
The chiller lter must be replaced every 6 months.
Parts required :
1 x New lter element - part number 1003282B00
5L container
Demineralized water
Caution: wear PPE (disposable rubber gloves, anti-static coverall, FFP3 respiratory protection, anti-static
safety shoes).
1. Switch off the printer (see section "Shutting printer down" on page 69).
2. Switch off the 2 UPS (see "E. Control/supply cabinet" on page 28).
3. Lock out and tag out the printer: position the main switch from the supply cabinet to position ”O”, then put a lock with a
tag out label on the switch. This will disconnect and isolate the printer from energy during the maintenance.
4. Open the right door of the control/supply cabinet.
5. The lter is located on the right corner. Close the input and output valves (A and B).
6. Unscrew the transparent lter cover and remove it by pulling downwards in order to reveal the inserted lter element.
7. Replace the old lter element with the new one.
8. Screw the transparent lter cover.
9. Open the input and output valves (A and B).
10. Re-start the printer (see section page 33).
A B

Table of Contents

Related product manuals