ABB i-bus
®
KNX
Parameters
34 2CDC509086D0201 | ABA/S 1.2.1
7.4 Simulation
Fig. 8: Simulation
Starts and stops the simulation.
Used to select simulation speeds.
Important for simulating timer functions such as Calendar.
Next Step starts a calculation cycle.
Around 50 times slower than real time.
Simulation is done in real time.
second in the simulation is 1 hour in real time.
Sets the simulation time and date.
button:
button:
Synchronizes the date and time with the real time of the PC.