EasyManua.ls Logo

ABB IRB 120 - Page 103

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspecting timing belts
Use this procedure to inspect timing belts.
InformationAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
1
xx1300002286
xx1300002287
Gain access to each timing belt by removing
the cover.
2
Check the timing belts for damage or wear.3
Continues on next page
Product manual - IRB 120 103
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
3 Maintenance
3.3.4 Inspecting timing belts
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals